INTEGRATION IMPERATIVE
The Target Modernization program includes plans to upgrade an additional 40-plus ranges over the next year. Fur- thermore, the Army has committed to deploying all future new ranges with TRACR and to using FASIT-based devices. The technical solutions identi- fied through the Target Modernization program will allow the Army to revital- ize existing ranges at a fraction of the cost associated with constructing new ranges.
The Target Modernization and FASIT architecture are predicated on lowering life-cycle costs through open standards, leveraging commercial communication frameworks, and a tight coupling of the
CONTROLLING FIRE
A Soldier uses the TRACR Control System at the Modified Record Fire Range at Fort Eustis, VA. TRACR uses the FASIT interface with a single control system that is compatible with all Army live-fire training ranges. (U.S. Army photo courtesy of PEO STRI.)
interfaces to the control systems. The decoupling of the ranges from specific vendors and the ability to move targets between ranges create significant savings. The Target Modernization program has documented more than $15 million in value engineering cost avoidance through deployment of the TRACR program alone.
THE FUTURE PM TRADE is now focusing on estab- lishing interface standards for live, virtual, and constructive training that can be partially or fully embedded into weapon systems. While embedded training (ET) has been difficult to define, let alone achieve, TRADOC’s vision, as outlined
in the U.S. Army Training Concept 2012- 2020, includes training while deployed.
Training in a deployed environment will necessitate maximum use of organic equip- ment and minimum use of appended training devices that require warehouses and maintainers. PM TRADE will lever- age the experience of the LT2 product line, expanding it to include standards and architecture for ET. Over the next year, PM TRADE will be working with weapon system PMs and TRADOC to leverage the LT2 approach.
Based upon the benefits demonstrated by MC-ITS and Target Modernization, the future of live training devices will drive leader development, training, and edu- cation outcomes, and will continue to expand the LT2 product line and realize necessary savings during this era of bet- ter buying initiatives. PM TRADE will be the premier provider and integrator of all live training products that are made available through the integrated training environment and that evoke the behav- iors necessary to achieve Army training standards today and beyond.
JAMES TODD is the Lead Systems Engi- neer and Architect for FASIT at PEO STRI, and a Senior Systems Engineer for the LT2 product line. Todd holds a B.S in mechani- cal engineering from the University of New Orleans and an M.S in industrial engineer- ing from Texas A&M University.
DR. JEREMY T. LANMAN is the Lead Systems Architect for PEO STRI’s CTIA and CPM construct, supporting the LT2 Family of Training Systems. Lanman holds a B.S. in computer science from Butler University, an M.S. in software engineering from Embry- Riddle Aeronautical University, and a Ph.D. in modeling and simulation from the Uni- versity of Central Florida.
56 Army AL&T Magazine
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108 |
Page 109 |
Page 110 |
Page 111 |
Page 112 |
Page 113 |
Page 114 |
Page 115 |
Page 116 |
Page 117 |
Page 118 |
Page 119 |
Page 120 |
Page 121 |
Page 122 |
Page 123 |
Page 124 |
Page 125 |
Page 126 |
Page 127 |
Page 128 |
Page 129 |
Page 130 |
Page 131 |
Page 132 |
Page 133 |
Page 134 |
Page 135 |
Page 136 |
Page 137 |
Page 138 |
Page 139 |
Page 140