Modernization Strategy demands that we prioritize materiel development to ensure that warfighters are best equipped to defend our nation.
The Army
and decision processes for annual integrated fires test campaigns. Tis begins with identifying developmental priorities based on time, complexity and impact. Configuration development is then used to plan the development of capability for the year. Tese annual test campaigns will become the standard testing proce- dure for the future as the Army continues to add and improve upon Army integrated air and missile defense architecture. Tis represents a dynamic shift in the way we test and qualify equip- ment provided to the warfighter. Tis capability constructs better scales and adapts materiel acquisition solutions to keep the pace with rapidly evolving technology and achieve enduring over- match with near-peer threats.
INTEROPERABILITY CERTIFICATION To deliver a meaningful capability, systems need the ability to effectively communicate on the battlefield, which is achieved
HARDWARE PRIORITIZATION
Integrated Fires Mission Command’s Hardware project office defined metrics to determine prioritization when addressing changes to equipment.