From the standpoint of ASA(ALT)’s test and evaluation unit, there’s a bet ter way to support T&E events, one that would directly improve operational readiness.
by Ms. Laura Pegher, Mr. Adam Bussey and Ms. Amber Dufour I
n an acquisition environment concerned with all things cost, schedule and performance, logistics and product testing historically have tended to be an afterthought or overlooked altogether. Te Army places a high priority
on validating performance requirements in various develop- mental and operational tests, but acquisition test events such as the logistics demonstration (log demo) and verification of the technical manual often take a back seat.
Based on historical data, the U.S. Army Forces Command (FORSCOM), along with other Army commands, Army service component commands and depot replacement units, have experienced significant challenges with sourcing log demos and technical manual verification events. Sourcing is the term used for applying Soldiers as a test resource. Tis takes the Soldiers in high-demand military occupational specialties (MOSs), specifically maintainer MOSs, away from their primary duties and deployment training while giving the test community a real-user experience.
Technical manual verification timelines can range from two weeks up to a year, depending on the system complexity,
and the average technical manual verification requires five Soldiers as test users. Te sourcing challenge is primarily because of the long durations of these events, with negative impacts on unit operational readiness as Soldier maintainers are pulled away to support the event. Given the current state of available resources, test and evaluation (T&E) require- ments are exceeding the Army’s capabilities across the force. Tus, the Army must develop solutions to set clear priorities and supply T&E events with adequate resources in order of importance.
THE ARMY RESOURCING PROCESS Te Army currently uses a committee called the Test Sched- ule and Review Committee (TSARC) to manage resources for Army tests, multiservice operational T&E, joint T&E and experiments or demonstrations. Te TSARC is respon- sible for maximizing the use of limited resources while minimizing the test events’ impacts on unit operational readiness. Te TSARC’s primary functions include:
• Coordinating all required test resources. • Synchronizing tests.
ASC.ARMY.MIL
27
ACQUISITION
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108 |
Page 109 |
Page 110 |
Page 111 |
Page 112 |
Page 113 |
Page 114 |
Page 115 |
Page 116 |
Page 117 |
Page 118 |
Page 119 |
Page 120 |
Page 121 |
Page 122 |
Page 123 |
Page 124 |
Page 125 |
Page 126 |
Page 127 |
Page 128 |
Page 129 |
Page 130 |
Page 131 |
Page 132 |
Page 133 |
Page 134 |
Page 135 |
Page 136 |
Page 137 |
Page 138 |
Page 139 |
Page 140 |
Page 141 |
Page 142 |
Page 143 |
Page 144 |
Page 145 |
Page 146 |
Page 147 |
Page 148 |
Page 149 |
Page 150 |
Page 151 |
Page 152 |
Page 153 |
Page 154 |
Page 155 |
Page 156