$
SUPPORTING THE WARFIGHTER
(2G PLM) to consolidate the LT2 prod- uct baselines using variation management and an integrated, feature-driven, prod- uct-line factory approach to software (see Figure 1). This
incremental approach
incorporates state-of-the-art automated software
tools and processes, manage-
ment dashboards, and software product line technology, all while protecting the investment in the existing LT2 core assets.
“The main shift in 2G PLM is realizing it is much more effective to view systems and software product line engineering as creating a means of production—a single system capable of automatically producing all of the products in a prod- uct line—rather than viewing it as the creation of numerous interrelated prod- ucts,” said Dr. Charles Krueger, Chief Executive Officer and Founder of the consulting firm BigLever Software Inc., and an internationally known software product line expert.
FEATURE-DRIVEN PERSPECTIVE 2G PLM allows for an automated pro- cess of generating all variants of products from a consolidated set of core assets. This means of production is simpler, more agile, more scalable, and more cost-effective. Shifting from a product- centric to a feature-driven perspective supports core assets based on the needs of the entire product line, resulting in high levels of reuse, deep asset expertise, and optimal quality. This eliminates uncontrolled management
growth in and allows us
complexity to move
beyond trying to keep up with all the current product issues and instead to focus on the evolution of the LT2 product line.
Supporting the Army vision to evolve live training solutions and to improve cost
The Marine Corps Instru- mented Training System was developed reusing 87 percent existing LT2 software and was completed in two years, sav- ing $11 million and seven years in schedule.
The U.S. Air Force Counter Improvised Explosive Device (IED) After-Action Review Sys- tem leveraged LT2 assets and fielded seven training systems to meet the Air Force IED training needs at four bases, with very little developmental investment.
LT2 Exercise Control, a compos- able set of capabilities, has been systematically leveraged for 13 different products fielded around the globe, delivering more than $94.2 million in cost avoidance for new product development, as well as significant cost avoidance for new equipment training, sus- tainment, and procurement.
environment, the 2G PLM approach provides the means to: DR.
Protect the significant live training investment.
Provide for the continued develo- pment, production, and sustainment of LT2 products and ease the insertion of new technology.
Realize objectives for return on investment and sustainment cost avoidance.
efficiencies in a resource-limited
Enable managers to maintain visibility and provide enhanced configuration
JEREMY T. LANMAN is the
Lead Systems Architect for PEO STRI’s Common Training Instrumentation Archi- tecture
Management construct, supporting LT2 Family
and Consolidated Product-Line the
of Training Systems. Lan-
man holds a B.S. in computer science from Butler University, an M.S.
in software
engineering from Embry-Riddle Aeronau- tical University, and a Ph.D. in modeling and simulation from the University Central Florida.
of
ASC.ARMY.MIL 113
LT2 software assets have been used not only by the Army, but also by the Marine Corps and Air Force to meet their require- ments ahead of schedule and for significant cost savings.
control of their systems, to avoid dupli- cating efforts.
CONCLUSION
“Managing the LT2 product line based on features rather than products will result in optimized scalability and improved time-to-field, ensuring our Soldiers are prepared for the challenges they face on the modern battlefield,” said Flanagan.
PM TRADE is avoidance, focused on systemic
reuse to eliminate redundancy, increase cost
and improve produc-
tion efficiencies. The 2G PLM approach demonstrates PM TRADE’s dedication to remain at the forefront of finding efficiencies, providing Soldiers with the realistic training solutions necessary to ensure that they are the best-trained force in the world.
For more Training
information, Community
www.lt2portal.org.
BRIAN E. KEMPER is the Live Train- ing Transformation (LT2) Chief Engineer for Program Executive Office Simulation, Training, and Instrumentation
(PEO
STRI) in the office of Project Manager Training Devices. Kemper holds a B.S. in electrical engineering from the University of Central Florida.
visit the Live portal
at
EFFICIENCIES
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108 |
Page 109 |
Page 110 |
Page 111 |
Page 112 |
Page 113 |
Page 114 |
Page 115 |
Page 116 |
Page 117 |
Page 118 |
Page 119 |
Page 120 |
Page 121 |
Page 122 |
Page 123 |
Page 124 |
Page 125 |
Page 126 |
Page 127 |
Page 128 |
Page 129 |
Page 130 |
Page 131 |
Page 132 |
Page 133 |
Page 134 |
Page 135 |
Page 136 |
Page 137 |
Page 138 |
Page 139 |
Page 140 |
Page 141 |
Page 142 |
Page 143 |
Page 144 |
Page 145 |
Page 146 |
Page 147 |
Page 148 |
Page 149 |
Page 150 |
Page 151 |
Page 152 |
Page 153 |
Page 154 |
Page 155 |
Page 156 |
Page 157 |
Page 158 |
Page 159 |
Page 160 |
Page 161 |
Page 162 |
Page 163 |
Page 164 |
Page 165 |
Page 166 |
Page 167 |
Page 168 |
Page 169 |
Page 170 |
Page 171 |
Page 172 |
Page 173 |
Page 174 |
Page 175 |
Page 176