ARMY AMMUNITION PLANT MODERNIZATION PLAN
SETTING STRATEGIC OBJECTIVES Te strategy centers on meeting the following objectives:
1. Increase manufacturing safety and readiness to meet current and future requirements.
2. Modernize and transform production processes, incorporat- ing best practices from industry.
3. Isolate energetic mass from people. 4. Remove personnel from energetic operations and replace manual operations with automation.
5. Ensure graceful degradation and resilient operations. 6. Design production processes to minimize the concentration of energetic materials in any one place.
7. Incorporate redundancy where possible and practicable.
8. Improve flexibility, maintainability and sustainability. 9. Integrate state-of-the-art technology and equipment. 10. Implement a proactive preventive maintenance program and use predictive maintenance to improve overall system perfor- mance and sustainability.
11. Design production lines that can be alternatively used for multiple products with minimum retooling and reconfig- uration of the physical system.
12. Reduce cost of operations. 13. Identify processes and equipment that reduce the cost of operating the facilities.
14. Identify efficiencies to reduce labor, material and energy costs. 15. Secure supply chain. 16. Mitigate single point failures. 17. Investigate U.S.-based production and vertical integration.
Each year, modernization projects are prioritized based on scor- ing calculated from weighted criteria and measured against two factors: first, the significance of mitigating the deficiency or consequence if the project is not executed (i.e., magnitude of the benefit or consequence), and second, the likelihood or prob- ability the benefit or consequence will occur if the project is not executed. Tese two metrics are multiplied, along with the corre- sponding scoring criteria weight, and then summed to produce a final score as illustrated in Figure 1, page 104.
Immediate safety and environmental compliance issues are considered “must-fund projects” and are prioritized above all other projects.
Project ranking is a critical process to ensure that funding is used in the most effective and efficient way possible. More than 100 modernization projects valued at $1.5 billion are in execution,
Construction of new facilities is critical for enabling continued production of ammunition.
102 Army AL&T Magazine Fall 2022 OUT WITH THE OLD
The new nitrocellulose production facility at Radford AAP in Virginia is scheduled to come online by the end of the year. The new facility will expand the production capacity above current levels, increase operational efficiencies, minimize steam and water consumption, minimize direct-labor utilization thereby improving operational safety, minimize waste streams and emissions, and improve the quality work environment. The new facility will also mitigate the risks of continued reliance on the legacy plant which has served far beyond its original design life expectancy. (Photos courtesy of JPEO A&A)
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108 |
Page 109 |
Page 110 |
Page 111 |
Page 112 |
Page 113 |
Page 114 |
Page 115 |
Page 116 |
Page 117 |
Page 118 |
Page 119 |
Page 120 |
Page 121 |
Page 122 |
Page 123 |
Page 124 |
Page 125 |
Page 126 |
Page 127 |
Page 128 |
Page 129 |
Page 130 |
Page 131 |
Page 132 |
Page 133 |
Page 134 |
Page 135 |
Page 136 |
Page 137 |
Page 138 |
Page 139 |
Page 140 |
Page 141 |
Page 142 |
Page 143 |
Page 144 |
Page 145 |
Page 146 |
Page 147 |
Page 148