search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
FIELDING THE FUTURE


Tese four keys were of the utmost impor- tance in conducting a virtual meeting of this size and importance. Te delivery of audio-enhanced briefings, audio added via a built-in Microsoft PowerPoint feature, before the event provided sufficient narra- tive detail to enable a cursory review of the information during the actual review. Te pre-event capture and response to panel members’ questions reduced the amount of time that would be required for questions and answers during the event. Te pre-event training and familiariza- tion events with the WebEx virtual tool enabled a majority of the team to hit the ground running, with all participants fully operational within the first half-hour of the first day. Te customized templates for questions and answers enhanced the deliv- ery of multifield, sortable information to enhance panel members’ understanding of the material presented.


LOAD ’EM UP


In addition, the project team developed and distributed event rules of engagement


Soldiers from the 595th Sapper Company load TSO dispenser launcher modules onto a Palletized Load System truck. (Photo by Marc A. Krauss, JPEO A&A)


Social distancing restrictions presented the project team the challenge of finding an alternative way to execute this major system engineering review, or run the risk of falling behind schedule.


to ensure orderly communication and sharing of information. Te rules spec- ified that microphones be muted as a default and instructed participants not to place calls on hold because of built-in hold music that is a distraction to others on the line. Tey also noted how presentations would be delivered, how the host would manage the information that must be shared with the team, how team members would use the chat function, and contin- gency communications for those unable to access the web-based application to view briefing information.


The XM204 integrated product team implemented an ambitious plan to complete the planned face-to-face, three- day review in a 1½-day virtual review. Te execution of this meeting required three


primary roles: a knowledgeable host to facilitate the discussion, an assistant host who managed screen share with attendees and a note taker.


Te first day of the review began with a 30-minute sign-in session to ensure that team members were able to access WebEx via web browser (preferred) or solely by telephone audio (not preferred). Te team achieved 100 percent sign-in with time to spare before moving on to the brief- ing packages.


For each briefing package, the host announced the slide deck and the briefer. Te briefer provided a five-minute exec- utive summary of the material covered. Ten the briefer answered questions from the review panel members and program


https://asc.ar my.mil


31


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139  |  Page 140  |  Page 141  |  Page 142  |  Page 143  |  Page 144  |  Page 145  |  Page 146  |  Page 147  |  Page 148  |  Page 149  |  Page 150  |  Page 151  |  Page 152  |  Page 153  |  Page 154  |  Page 155  |  Page 156  |  Page 157  |  Page 158  |  Page 159  |  Page 160  |  Page 161  |  Page 162  |  Page 163  |  Page 164  |  Page 165  |  Page 166  |  Page 167  |  Page 168  |  Page 169  |  Page 170  |  Page 171  |  Page 172