search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
CSTEP Another LOSER


WIN-T Increment 2 provides solutions to network challenges


by COL Chuck Hoppe and LTC Rob Collins


Network-Tactical (WIN-T) Increment 2 will provide on-the-move (OTM), high- capacity satellite communications down to the company echelon for the first time, as well as an integrated high-capacity terrestri- al and satellite communications network at the battalion level and above. The WIN-T program emerged four years ago from the Nunn/McCurdy process of control- ling program costs as a new program—or, more accurately, four new programs.


A 24


The former Joint Network Node program was redesignated as Increment 1 with some changes. The Army has used Increment 1 for the past six years and is quickly nearing completion on fielding the 217 unit flags.


Army AL&T Magazine


s the Army continues to bring new capabilities to bear on its warfighting mis- sion, Warfighter Information


The “big bang” WIN-T program was divided up, creating three additional pro- grams with incremental capability builds. One of these programs, WIN-T Incre- ment 2, is the initial OTM capability and is soon to go to its first Army unit.


INCREMENTAL CAPABILITIES Similar to a home Internet connec- tion, WIN-T Increment 1, the current tactical backbone, provides high-speed, high-capacity voice, data, and video com- munications to units on the battlefield, at-the-halt (ATH), or at-the-quick-halt.


Unlike a home Internet connection, WIN-T Increment 2 provides this net- work to the formation while it is OTM. From an acquisition program perspective, WIN-T Increment 2 is post-Milestone


C; the program is in low-rate initial production and is preparing for initial operational test and evaluation (IOT&E) in FY12.


The program office is using the remain- ing time before the IOT&E to complete developmental testing, characterize the network, assess safety release require- ments, validate training materials, and evaluate logistics support processes before new equipment fielding and training. The program management and prime contractor team are setting conditions now so that when fielding begins in early 2012, program configuration items are producible in the quantities and time- frame needed and meet the reliability and maintainability requirements that ensure the equipment is dependable, complete, and capable of doing what is needed.


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136