THE BIG PICTURE
TABLE 1
ICD Revision C
D E
Document Date
26 JUN 12 8 JAN 13 3 MAY 13
MAKING CHANGES FASTER
The AIAMD PO streamlined the process of incorporating revisions to the ICD by using NORs rather than ECPs. The NORs allow P&F kit developers to implement changes immediately. (SOURCE: AIAMD PO)
Te AIAMD PO decided to stream- line the process of incorporating changes to the ICD. In July 2011, the PO began issuing notices of revision (NORs) for changes determined to be in scope, requiring no additional funds to implement. Te NORs paid divi- dends by enabling P&F kit developers to implement changes immediately; thus all key stakeholders can maintain crucial momentum in executing their component-level designs without sacri- ficing control of the interface itself.
At the AIAMD critical design review in May 2012, after successful development of Revision C in the P&F B-Kit to A-Kit ICD, the AIAMD PO decided to con- tinue the NOR process. Because of early NOR approval by stakeholders, AIAMD can estimate schedule savings of five to 13 months. (See Table 1.) At this time, all NORs are formally approved or dis- approved through the AIAMD Virtual Configuration Control Board, adding further efficiencies. Te virtual board eliminates the need for all the decision- making stakeholders
to spend several
hours physically attending a meeting to review the NORs.
INTEGRATED CAPABILITY
Air defense battle management system operators assigned to the 108th ADA Brigade employ the AN/MPQ-64 Sentinel June 21, 2013, in support of the 2nd Brigade Combat Team, 82nd Airborne Division (2-82) during Joint Operational Access Exercise 13-03 at Fort Bragg, NC. By FY17, the AIAMD PO plans to integrate Sentinel radars, among several other systems, to support engagement of air and missile threats. Each sensor and weapon platform will have a P&F inter- face module, defined by a P&F ICD. (U.S. Army photo by SSG Jason Hull, 2-82 Public Affairs)
CONCLUSION No process for managing an ICD is per- fect, and the AIAMD PO continuously looks for ways to make the process better. Among the changes that AIAMD may implement in the next six months are:
116 Army AL&T Magazine April–June 2014 # NORs
Implemented 16
11 17
Approximate Schedule Savings
7 months 5 months 13 months
to Revision F in February 2014. A stan- dard systems engineering approach uses engineering change proposals (ECPs) to accomplish the changes necessary to revise an ICD. However, ECPs are contractual actions that change a con- tractor’s statement of work and may take up to six months to implement, with a potentially significant impact on a pro- gram’s schedule and costs.
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108 |
Page 109 |
Page 110 |
Page 111 |
Page 112 |
Page 113 |
Page 114 |
Page 115 |
Page 116 |
Page 117 |
Page 118 |
Page 119 |
Page 120 |
Page 121 |
Page 122 |
Page 123 |
Page 124 |
Page 125 |
Page 126 |
Page 127 |
Page 128 |
Page 129 |
Page 130 |
Page 131 |
Page 132 |
Page 133 |
Page 134 |
Page 135 |
Page 136 |
Page 137 |
Page 138 |
Page 139 |
Page 140 |
Page 141 |
Page 142 |
Page 143 |
Page 144 |
Page 145 |
Page 146 |
Page 147 |
Page 148 |
Page 149 |
Page 150 |
Page 151 |
Page 152 |
Page 153 |
Page 154 |
Page 155 |
Page 156 |
Page 157 |
Page 158 |
Page 159 |
Page 160 |
Page 161 |
Page 162 |
Page 163 |
Page 164 |
Page 165 |
Page 166 |
Page 167 |
Page 168 |
Page 169 |
Page 170 |
Page 171 |
Page 172 |
Page 173 |
Page 174 |
Page 175 |
Page 176 |
Page 177 |
Page 178 |
Page 179 |
Page 180 |
Page 181 |
Page 182 |
Page 183 |
Page 184 |
Page 185 |
Page 186 |
Page 187 |
Page 188 |
Page 189 |
Page 190 |
Page 191 |
Page 192 |
Page 193 |
Page 194 |
Page 195 |
Page 196 |
Page 197 |
Page 198 |
Page 199 |
Page 200