developing the Virtual Forward Oper- ating Base (VFOB™), an integrated modeling and analysis program that cap- tures the complex adaptive behavior of a - ing of base camp planning, design, and operations tools.
user evaluation is the Contingency Base Resource Calculator, a user input tool that captures and analyzes CB subsystem inter- relationships and the associated inputs and outputs. The calculator tracks 12 char- camp: power,
fuel, potable water, bot-
tled water, storage area, personnel, gray water, black water, solid waste, food, maintenance, and footprint).
and area (facility type ANALYZING THE INVENTORY
The Net Zero Installations – Energy tool allows planners to optimize resources and use clustering to develop community-level analysis. (Image courtesy of ERDC)
facility types associated with each “build” of the CB. Camp size and facility types can be varied within the build types to the extent of the facilities included as a to adequately represent the majority of potential camp builds.
ERDC is concurrently developing a resource “accounting tool” for CB planning,
called VFOB-Lite, which
will be part of the VFOB suite of tools. VFOB-Lite contains a graphical user interface that allows system types and/or components to be individually placed as part of a base camp virtual build. Each of
these systems or components will
have resource requirements assigned to them so that the resource needs of the
As part of the simulator development, ERDC has developed a user interface to automatically populate the OpenDSS script-based input
feed, as opposed to
manually entering lines of data. Testing of this simulator began this fall. Future development within the VFOB suite that is scheduled for 2013-15 includes a water systems model for potable, sanitary, and non-potable water; a waste management model; and a protection requirements model.
For more information, go to http://www.
cecer.army.mil.
working at ERDC’s Construction Engineer- Savoie
holds a B.S. in civil engineering
engineering from Auburn University.
entire camp can be determined based order-of-magnitude determination
of
the resource requirements for the CB’s day-to-day operations.
Another tool in the VFOB suite that is nearing initial completion is the power system model using OpenDSS, an open- source, script-based, comprehensive simulation tool for electric distribution systems developed by the Electric Power Research Institute. This tool can accurately model electric components, including generators, loads, line cables, transformers, loads, protection, and switches.
ASC.ARMY.MIL
113
SCIENCE & TECHNOLOGY
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108 |
Page 109 |
Page 110 |
Page 111 |
Page 112 |
Page 113 |
Page 114 |
Page 115 |
Page 116 |
Page 117 |
Page 118 |
Page 119 |
Page 120 |
Page 121 |
Page 122 |
Page 123 |
Page 124 |
Page 125 |
Page 126 |
Page 127 |
Page 128 |
Page 129 |
Page 130 |
Page 131 |
Page 132 |
Page 133 |
Page 134 |
Page 135 |
Page 136 |
Page 137 |
Page 138 |
Page 139 |
Page 140 |
Page 141 |
Page 142 |
Page 143 |
Page 144 |
Page 145 |
Page 146 |
Page 147 |
Page 148 |
Page 149 |
Page 150 |
Page 151 |
Page 152 |
Page 153 |
Page 154 |
Page 155 |
Page 156 |
Page 157 |
Page 158 |
Page 159 |
Page 160 |
Page 161 |
Page 162 |
Page 163 |
Page 164 |
Page 165 |
Page 166 |
Page 167 |
Page 168 |
Page 169 |
Page 170 |
Page 171 |
Page 172 |
Page 173 |
Page 174 |
Page 175 |
Page 176 |
Page 177 |
Page 178 |
Page 179 |
Page 180 |
Page 181 |
Page 182 |
Page 183 |
Page 184 |
Page 185 |
Page 186 |
Page 187 |
Page 188 |
Page 189 |
Page 190 |
Page 191 |
Page 192 |
Page 193 |
Page 194 |
Page 195 |
Page 196 |
Page 197 |
Page 198 |
Page 199 |
Page 200 |
Page 201 |
Page 202 |
Page 203