he timely closeout of completed contracts is a major acquisi- tion issue being addressed    


with  Part 4.804, “Procedures for closing out   required to be closed within six months after the government’s acceptance of the project. Completed contracts not closed within the six-month period are listed as over-aged contracts for closeout.


The closeout process is important in any contracting organization. It is even more important to an organization operat- ing within a contingency environment, because it allows for the return of unex- pended funds that can be used for other urgent and necessary projects. The timely closeout of completed contracts is a key component of the overall contractual life  of logistical, security, and construction concerns, and vital information for proj- ect delivery teams (PDTs) that work on the suitability of design and construction for future contingency operations.


The closeout phase of a contract begins when a contractor has physically com- pleted a project and the government has accepted it.


 in the closeout at every stage. The team normally includes a team leader from project management, a contract spe-     of Counsel. The PDT ensures that all actions required by the  agency procedures are completed prop- erly: that the project is accepted, the    release of claims is completed and signed by the contractor.


STAYING CURRENT


Along with tackling the closeout of over-aged contracts, the U.S. Army Corps of Engineers – Transatlantic Division is using a two-phased approach to close out more recent contracts, such as those for Camp Sayar, in a timely manner so they don’t become over-aged. Here, workers erect structures at Camp Sayar, a $63.3 million complex of about 135 buildings providing offices, housing, maintenance facilities, utilities, recreational areas, and a helicopter pad for the Afghan National Army’s 207th Corps in Farah province, Afghanistan. (USACE photo by Karla Marshall)


             contract are archived in the document storage warehouse.


ATTACKING THE PROBLEMS The U.S. Army Corps of Engineers –


Transatlantic Division (TAD), Win-


        Responsibility, comprising 20 countries  Central Asia. TAD’s major emphasis is on awarding contracts for the construction    


ASC.ARMY.MIL 131


CONTRACTING


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139  |  Page 140  |  Page 141  |  Page 142  |  Page 143  |  Page 144  |  Page 145  |  Page 146  |  Page 147  |  Page 148  |  Page 149  |  Page 150  |  Page 151  |  Page 152  |  Page 153  |  Page 154  |  Page 155  |  Page 156  |  Page 157  |  Page 158  |  Page 159  |  Page 160  |  Page 161  |  Page 162  |  Page 163  |  Page 164  |  Page 165  |  Page 166  |  Page 167  |  Page 168  |  Page 169  |  Page 170  |  Page 171  |  Page 172  |  Page 173  |  Page 174  |  Page 175  |  Page 176  |  Page 177  |  Page 178  |  Page 179  |  Page 180  |  Page 181  |  Page 182  |  Page 183  |  Page 184  |  Page 185  |  Page 186  |  Page 187  |  Page 188  |  Page 189  |  Page 190  |  Page 191  |  Page 192  |  Page 193  |  Page 194  |  Page 195  |  Page 196  |  Page 197  |  Page 198  |  Page 199  |  Page 200  |  Page 201  |  Page 202  |  Page 203