BACK TO THE DRAWING BOARD


Originally the outer breakwater of Dubai’s Palm Jumeirah Island was designed as a continu- ous barrier. But this prevented natural tidal movement, and the seawater within the crescent breakwater became stagnant. A 2009 retrofit created gaps on the sides of the breakwater, connected by bridges, that allowed tidal movement to oxygenate the water and prevent stag- nation. (SOURCE: Getty Images)


mounted a gimbaled seeker contraption on the skids of a helicop- ter and flew a simulated path to determine whether there were enough degrees of freedom for the seeker’s movement.


It might have been an extra expenditure of funds not anticipated. But it was the best approach before having a finished missile to integrate, allowing the project team to go forward with design of other components.


And during the downrange initial operational test of the Army Tactical Missile System, when the very first of only 15 missiles to be fired didn’t hit the target and was scored a failure, it was our


“hardware-in-the-loop” software model back at Redstone Arsenal, Alabama, that told us it flew right where it was supposed to—but had the wrong targeting data for the gunners to input.


History is replete with examples of people who failed to adequately model before they began construction, including the Tacoma


Narrows Bridge collapse of 1940 (unexpectedly swaying wildly in the wind and recorded on film), and the retrofitting of Dubai’s Palm Jumeirah Island in 2009, with breakwater crescent open- ings (a bit of an afterthought) to prevent internal water stagnation. Te problem is no different with weapon systems.


M&S THROUGH THE WICKETS During the materiel solutions analysis phase of the acquisition process, it’s common for PMs to invest in force-on-force model- ing to predict combat value using key performance parameters of the new system. Other concept studies include such model- ing to aid the analysis of alternatives effort.


Later on, during technology maturation and risk reduction, our prototypes will be early design models to demonstrate technol- ogy readiness levels and reduce risk by means of technical and operational discoveries during simulations. M&S efforts during both of these phases inform us as well as the user community.


HTTPS: / /ASC.ARMY.MIL


107


COMMENTARY


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139  |  Page 140  |  Page 141  |  Page 142  |  Page 143  |  Page 144