search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
ITERATIVE INNOVATION


and money to outsource, customers can accelerate their development schedules.


WIN-T’s EMC2 project, also known as the “command post in the sky,” fea- tured a C-17 aircraft integrated with full network and mission command capabilities—from takeoff to jump—to give paratroopers and their commanders reachback to their home station and eyes on the destination. Tese critical systems required protection from the powerful vibrations and aerodynamic forces that occur during a cargo aircraft’s flight. In addition, the communications equip- ment could not produce electromagnetic interference with other command-and- control or airplane systems, yet still had to be light enough to meet a four-man weight-lift limit per military standards.


GOT YOUR BACK


CERDEC is building an apparatus to test the Energy Harvesting Assault Pack, a Soldier-wearable intelligent power manager that would power situational awareness capabilities such as GPS and Nett Warrior. The WaTTS/LKEH test apparatus will simulate Soldier movements in a range of environments and at different positions and speeds. (Photo courtesy of CERDEC)


the effort for CERDEC and leveraged its PIF to complete the requirements.


WIN-T and the PIF reside at Aberdeen Proving Ground, MD, enabling WIN-T project staff to maintain eyes-on status of their prototype during each phase of the process and allowing for course correc- tions prior to establishing requirements.


At the end of any PIF engagement, cus- tomers such as WIN-T generally produce a small number of fielded products to help prove the concept, and then either help customers transition the product


86 Army AL&T Magazine


to an Army depot or provide a technical data package that the customer can use to solicit production from industry. In either case, by integrating the prototype up front, the technology is more mature and less susceptible to major redesign, saving both time and money.


ACCELERATING SCHEDULE Typically, when a product manager orga- nization leads and manages its customer’s product development effort, it often out- sources the specific product engineering work. However, by


engaging directly with a PIF rather than spending the time October-December 2015


CERDEC PIF engineers designed pro- totypes for ruggedized transit cases to house the systems and a modular work- station to provide a flexible workspace for the Soldiers. Seemingly small fabrications can make the difference in a product’s success or failure, and the key to rugged- izing the cases came down to creating specialized brackets to connect the cases to the racks. PIF engineers created plastic versions of the brackets on a 3-D printer to rapidly evaluate design revisions rather than expending valuable metal fabrica- tion time for each revision. Te design also allowed easy access to the equipment inside the cases and, most importantly, special filters integrated inside the cases blocked electromagnetic interference.


For the workstation design, CERDEC PIF engineers fabricated a modular apparatus that is configurable for up to seven users, provides power and Inter- net connections and ties securely to the C-17 floor—yet collapses to cre- ate a clear exit path for paratroopers to facilitate their jumps. PIF engineers


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139  |  Page 140  |  Page 141  |  Page 142  |  Page 143  |  Page 144  |  Page 145  |  Page 146  |  Page 147  |  Page 148  |  Page 149  |  Page 150  |  Page 151  |  Page 152  |  Page 153  |  Page 154  |  Page 155  |  Page 156  |  Page 157  |  Page 158  |  Page 159  |  Page 160  |  Page 161  |  Page 162  |  Page 163  |  Page 164  |  Page 165  |  Page 166  |  Page 167  |  Page 168  |  Page 169  |  Page 170  |  Page 171  |  Page 172  |  Page 173  |  Page 174  |  Page 175  |  Page 176  |  Page 177  |  Page 178  |  Page 179  |  Page 180  |  Page 181  |  Page 182  |  Page 183  |  Page 184  |  Page 185  |  Page 186  |  Page 187  |  Page 188  |  Page 189  |  Page 190  |  Page 191  |  Page 192  |  Page 193  |  Page 194  |  Page 195  |  Page 196  |  Page 197  |  Page 198  |  Page 199  |  Page 200  |  Page 201  |  Page 202  |  Page 203  |  Page 204  |  Page 205  |  Page 206  |  Page 207  |  Page 208