search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
duties, to make sure everyone is aware of anything out of the ordinary they might encounter. Teamwork among all departments is essential, as well as proper equipment for extreme weather events. For winter storms, we deploy our “win- ter action plan,” which includes moving extra locomotives, on-track snow removal equipment and generators to affected areas to assist our ability to quickly recover from the storm and resume nor- mal operations.


In a broader scope, we encourage all our employees to live safely for their families, to take their time to be safe and to look out for each other. Tanks to all of these efforts, CSX had the lowest injury rates of all the Class I railroads in 2014, even as gross ton mileage increased.


PLANNING FOR SAFETY


A mechanical shop manager and a welder discuss work being performed on rail cars in a shop at the Radnor Yard. CSX believes safety starts with individual decisions every day.


Army AL&T: How much infrastructure does CSX own and operate? How do you monitor that infrastructure, tracks and bridges and whatever else for mainte- nance, repairs or replacement?


CSX develops employees with a combination of 70 percent on-the- job training, 20 percent coaching and mentoring and 10 percent formal instruction.


freight; CSX provides classroom and hands-on training to first responders in the communities in which we operate and to the customers who use CSX to transport their materials.


We always say that railroading is an outdoor sport, and that means we face extreme weather conditions on a fairly regular basis, from hurricanes to floods to blizzards. While we always want to continue seamless operations for our customers, employee safety is


the first


factor we consider when determining whether to continue operating during extreme weather events. If we can safely maintain operations during a storm, we use our safety briefings and job briefings, which are more specific to each person’s


Sanborn: As a company we spend nearly half of our capital budget annually to maintain


our critical mainly infrastructure


to ensure that it can provide safe, reli- able and efficient service for customers. Maintenance


involves three


areas: tracks, bridges and locomotives or cars. About 25 percent of our work- force is dedicated to the maintenance of our infrastructure, with significant safety and technical training and certifications.


Te CSX network includes more than 21,000 miles of track throughout 23 states, the District of Columbia and two Canadian provinces. Tat includes more than 16,000 bridges,


required by the


government to be inspected at least once per year. We meet or exceed that man- date. Te track structure on bridges is inspected and monitored each week. Any


ASC.ARMY.MIL 95


CRITICAL THINKING


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139  |  Page 140  |  Page 141  |  Page 142  |  Page 143  |  Page 144  |  Page 145  |  Page 146  |  Page 147  |  Page 148  |  Page 149  |  Page 150  |  Page 151  |  Page 152  |  Page 153  |  Page 154  |  Page 155  |  Page 156  |  Page 157  |  Page 158  |  Page 159  |  Page 160  |  Page 161  |  Page 162  |  Page 163  |  Page 164  |  Page 165  |  Page 166  |  Page 167  |  Page 168  |  Page 169  |  Page 170  |  Page 171  |  Page 172  |  Page 173  |  Page 174  |  Page 175  |  Page 176  |  Page 177  |  Page 178  |  Page 179  |  Page 180  |  Page 181  |  Page 182  |  Page 183  |  Page 184  |  Page 185  |  Page 186  |  Page 187  |  Page 188  |  Page 189  |  Page 190  |  Page 191  |  Page 192  |  Page 193  |  Page 194  |  Page 195  |  Page 196  |  Page 197  |  Page 198  |  Page 199  |  Page 200  |  Page 201  |  Page 202  |  Page 203